The Advanced Approval life cycle requires the specific statuses described in Creating the Advanced Approval document statuses .
To create the Advanced Approval life cycle:
Note In the following table, the property values must be set exactly as shown.
Option | Value |
---|---|
Lifecycle code |
10.adv |
Lifecycle name |
Advanced Approval |
Approved status |
Approved Note When this option is set to Approved, the life cycle is finished when the status is reached but the document is not released yet. If this option is set to Released, the user who started the life cycle can release the document. |
Expired status |
Obsolete |
Initial status |
Draft |
From | To | Advanced approval |
---|---|---|
Draft (1.90) |
For Verification (1.100) |
|
For Verification (1.100) |
Draft (1.90) |
|
For Verification (1.100) |
Approve (1.110) |
Enabled |
Approve (1.110) |
For Verification (1.100) |
|
Approve (1.110) |
Approved (1.120) |
Enabled |
Approved (1.120) |
Approve (1.110) |
|
Approved (1.120) |
Released (1.900) |
|
Released (1.900) |
Obsolete (9.900) |
Related concepts
About the Document Circulations add-on
Related tasks
Configuring circulation options
Configuring the Advanced Approval life cycle
Creating the Advanced Approval roles
Creating the Advanced Approval document statuses